Fast Track
Danbarry Cinema
Chillicothe, Ohio
On budget in 7 months!
- 30,000 SF building utilizing Pre-cast concrete wall panel construction
- Ten Screen Cinema
- Dryden Builders has constructed FIVE DanBarry Cinema’s located in Indiana and Ohio
- Eight acres site development to Occupancy in 7 months!
- "Dryden proved themselves after the first two theaters such that all the projects since then I felt comfortable negotiating solely with Dryden. Dryden has excellent problem solving skills and they always keep my interest as the owner paramount." (Barry Kohn, Owner)
Fifth Third Bank
Franklin, Ohio
On budget in 75 Days!
- 5,000 SF building with 5 drive thru lanes
- Site development to Occupancy in 75 days!
Wall 2 Wall Soccer
Mason, Ohio
On budget in 6 months!
- Design-Build 110,000 SF building on a 23 acre site
- 40' tall Precast concrete wall panel system
- Conventional Wide-flange steel structure (208' clear span @ big field)
- Two indoor soccer fields, batting cages, banquet facilities, snack bar, tenant spaces, complete site development
- Site demo to Occupancy in 6 months!
- "Dryden provided us a complete Turn-key job from presentations at Planning Commission meetings - to coordination of out-of-state specialty subcontractors - to easement agreements with neighbors - to coordinating our grand opening party! "Dryden’s team fought through the winter and met our deadline so we could be open for our winter leagues" (Dante Rainone, Operations Manager)
Transcontinental Printing Company, Inc.
Fairborn, Ohio
On budget in 5 months!
Design-Build 81,000 SF industrial printing facility complete with site development, four docks, elevated office area, fluted block, metal siding and standing seam metal roof. 2100 cubic yards of concrete floor poured in 36 hours. “Timing of this project was critical to our business since we had purchased a $ 2M printing press that had to be received on January 14, 2000 in the new building. We knew from our first meeting with Dryden Builders that they would meet our deadline. They beat this date by 14 days!”(Ralph Pontillo, GM)
City of Moraine Additions
On budget in 6 months!
Design-Build 15,000 SF building additions including two-story Police wing, single story administration wing and site development. Slate wall panels and precast concrete panels were used to maintain the traditional look. “Dryden Builders was the only one who submitted a bid on precisely what we had asked for, guaranteed delivery of the project on time, and was the lowest bidder at $1.8 million dollars.The contract went to them and they delivered – on time, within budget, and with no change orders or extras.”(excerpt from City Council Open House Invitation)
Sycamore Creek Country Club
Springboro, Ohio
On budget of Construction in 51 days!
15,000 SF complete Interior Renovation including Dinning rooms, Ball room, Bar, Men’s Grille, Offices, Restrooms and new Redwood Deck area. Started demo on 1-5-98 (after New Years Eve Party) and received Occupancy Certificate on 2-24-98 (before Golf Course Reopened for season). “Timing was everything on our renovation project. The job had to be complete when the golf course reopened for the season and therefore penalty clauses were in place. Don Hinkel, President of Dryden, was personally on the job everyday physically doing the work and keeping me apprised of the progress. They did it on time and the quality is superb.” (Dave Kackle, GM)
Domino's Pizza
Fairfield, OH
On budget of Construction in 40 days!
1,550 SF Free standing new prototype block / EIFS building and complete site development was constructed in only 40 calendar days (this includes 9 rain days). Dominos lost their lease space and needed the new building completed ASAP – Dryden’s Fast Track approach allowed Dominos to have a quick transition and maintain service to all their customers.
Rely-On Manufacturing, Inc.
Dayton, Ohio
On budget of Construction in 98 days!
Bad soil required 4 feet of undercut and haul off. 16’ tall full height masonry firewall required on one side with 8 ’ tall block wrap and interior block walls for mezzanine. Metal siding above block with Standing Seam Metal Roof system. Design-Build 7,600 SF of building on a 12,000 SF lot required just-in-time deliveries. “I still can’t believe that they built my building so fast. Everything was very well planned out and the job went like clockwork. When Dryden ran into soil problems, they came to me immediately with a solution and they had the soil replaced in 72 hours.” (Pete Mosher, Owner)